ROK 2018 :
The following tasks were performed for AGAT S.A. Company:
- Renovation of the pipeline under the Lesiska – Sompolno swamp
- Construction and assembly works at MPS-1 in Powidz
- Prefabrication and assembly of pipelines during the construction of tanks at the Fuel Base in Koluszki
- Installation of a DN250 pipe and bolts in Biała Dolna
- Installation of a DN250 pipe and bolts in Wierzchowiska
The following renovations and modernizations were carried out for PERN S.A. Company:
- Renovation of foam collectors on SRs at the Fuel Base in Nowa Wieś Wielka
- Repair of the embankment protecting the pipelines of the I and II threads in Lubiechów Górny
- Replacement of collectors and valves at the distribution stations in the Fuel Base in Nowa Wieś Wielka
- Replacing the ladder on tank no. 11 at the Miszewko Strzałkowskie Base
ROK 2017 :
The following renovations and modernizations were carried out for PERN S.A. Company:
- Renovation of the DN600 pipeline under the road and parking lot in Miszewko Strzałkowskie
- Modernization of pump reliefs in SZ-3 Łupowo
- Modernization of the leak tank in SZ-1 Kleczew
- Liquidation of shallow water in Łęg
- Modernization of the oil installation in ST-5 Tarnowo Podgórne
the following tasks were performed for OLPP Sp. z o.o. Company:
- Construction of a new ON and OOP tray in the Fuel Base in Nowa Wieś Wielka
- Dismantling of roofs on tanks 16 and 17 in the Fuel Base in Nowa Wieś Wielka
- Renovation of water and foam installations on tank groups I and III in the Fuel Base in Nowa Wieś Wielka
- Renovation of water and foam installations on tank groups I and III in the Fuel Base in Nowa Wieś Wielka
The following tasks were performed for CLIMBEX SA Company:
- Renovation of the tank in the Wierzbno Fuel Terminal
- Renovation of tank no. 4 in the Miszewko Strzałkowskie Base
- Renovation of tanks no. 6 and 8 in the Gdańsk Base
- Renovation and legalization of the 22 V tank = 100,000 m³ at the Adamowo Base
The following task was completed for AGAT SA Company:
- Construction of an ON-LINE additive installation in Fuel Base No. 21 in Dębogórze
ROK 2016 :
The following renovations and modernizations were carried out for PERN S.A. Company:
- Renovation of the road crossing in Łęg
- Renovation of the DN500 pipeline under the road in Witnica
- Renovation of the first line of the pipeline at the training ground in Skwierzyna
- Repair of the dike dividing the reservoirs in the Miszewko Strzałkowskie Base
the following tasks were performed for OLPP Sp. z o.o. Company:
- Renovation of storage tank no. 5 V = 5,000 m³ in Fuel Base No. 5 in Emilianów
- Repair of the supporting structure pillars of the viaduct in Fuel Base No. 2 in Nowa Wieś Wielka
- Construction of an additive dosing installation in Fuel Base No. 2 in Nowa Wieś Wielka
ROK 2015 :
The following tasks were performed for AGAT S.A. Company:
- Execution of piping and foam installation as well as filling lines and arms at Fuel Terminal No. 74 in Ostrów Wlkp.
- Laying the 530 pipeline under the Bogusławice swamp
The following renovations and modernizations were carried out for PERN S.A. Company:
- Installation of a sewage tank in ST2 Zawady
- Renovation of the pipeline under the road in Skwierzyna
- Modernization of the Kc-1 II and Kc-2 II cleaner receiving and sending chambers in the Miszewko Strzałkowskie Base
- Securing the pipeline at the intersection with the drainage ditch in Leszno
- Modernization of the technological pipe system and reconstruction of the supports of the pipelines I and II in the SZ640 Bielinek
- Repair of the mobile ladder on tank no. 13 in the Miszewko Strzałkowskie Base
- Renovation of the pipeline under the road in Ramutówko
The following tasks were performed for CLIMBEX SA Company:
- Renovation and legalization of the 2 V=50,000 m³ tank in the Gdańsk Base
- Renovation and legalization of the 29 V tank = 50,000 m³ in the Miszewko Strzałkowskie Base
ROK 2014 :
The following renovations and modernizations were carried out for PERN S.A.:
- Repair of the mobile ladder on tank No. 9 in the Miszewko Strzalkowskie Depot
- Repair of DN500 pipeline under the road in Gutowo Wielkie municipality
- Renovation of the tray in the Adamowo Base
- Modernization of tank pipelines on tanks 23 and 26 in the Miszewko Strzałkowskie Base
- Renovation of the DN300 pipeline on the SF1 Płock – Nowa Wieś Wielka section in Seroczki Kol.
the following tasks were performed for OLPP Sp. z o.o. Company:
- Replacement of technological tanks in Fuel Base No. 17 in Barycz
- Renovation of technological installations in the product pumping station in Fuel Base No. 15 in Narewka
The following tasks were performed for AGAT S.A. Company:
- Expansion of the fuel supply system in Gdynia
- Anti-corrosion protection of tank manholes in MPS-2 in Krzesiny
The following tasks were performed for CLIMBEX SA Company:
- Renovation and legalization of the 2 V=50,000 m³ tank in the Gdańsk Base
- Renovation and legalization of the 29 V tank = 50,000 m³ in the Miszewko Strzałkowskie Base
ROK 2013 :
The following tasks were performed for AGAT S.A. Company:
- Construction of MPS-1 and MPS-2 airport storage areas; installation of transmission pipeline on the military airport in Poznan-Krzesiny
The following renovations and modernizations were carried out for PERN Przyjaźń SA Company:
- Repair of dike in BS Plebanka
- Execution of fencing-related works in Z6W Helenka and Z10W Leszno
- Repair of foundations of the second node’s output tray in Zawady
- Installation of the DN1000 sliding bolt in BM Gdansk
- Modernization of the protection system in the office located in Miszewo Strzałkowskie
- Installation of a DN1000 bolt in BM Gdańsk
The following task was carried out for TECHNOMONTAŻ Sp. z o. o.:
- Safe pipe cutting in BP in Emilianowo
The following service was provided for the CKTiS S.A. Company:
- Corrosion removal from steel installations in Cracow-Olszanica
ROK 2012 :
The following tasks were performed for AGAT S.A. Company:
- Modernization of the JET-A1 fuel intake and distribution system in TP no. 81 in Cracow Olszanica
- Construction of MPS-1 and MPS-2 airport storage areas; installation of transmission pipeline on the military airport in Poznan-Krzesiny
The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:
- Repair of oil storage tank in ST-4 Kleczew
- Repair of protective components of the pipeline section crossing the watercourse in Gorczenica
- Replacement of the DN600 sliding bolt in SZ Jasienica
- Shallowing of the optical fiber at the intersection with the Brzozów channel
ROK 2011 :
The following tasks were performed for AGAT S.A. Company:
- Lowering of the pipeline in BM 111 in Wroclaw
- Reconstruction of the pumping station and the slop tank system in BP Emilianów
- Expansion of MPS-1 and MPS-1 of the airport in Łask
- Creation of the comprehensive fire protection system, including directional pipelines for the EB1 and EB2 tanks in BM111 in Wroclaw
- Creation of the DN200 tank connecting pipeline in BM111 in Wroclaw
- Connection of the fire protection system to the foam distribution turrets in BM 111 in Wroclaw
- Creation of customized adapters for the ENRAF device in BM 111 in Wroclaw
- Creation of customized fire sprinkler system, being a part of the loading interface in BM 111 in Wroclaw
The following repairing works and modernizations were executed for the PERN Przyjaźń S.A. Company:
- Replacement of measuring posts in the city center section
- Pipeline R1 –R2 in Gdansk mending
- Oil gathering unit in ST-6 Łupowo mending
- Repair of horizontal perforations under the road in Mykanów, Konopiska
- Installation of measuring posts in the village of Miroslav
- Replacement of the pipeline in Trzepowo Nowe
ROK 2010 :
The following tasks were performed for AGAT S.A. Company:
- Modernization of the fire protection system in the OLPP no. 9 Fuel Depot in Wola Rzędzińska
- Modernization of 10 fuel tanks for the PKN Orlen SA
- Modernization of excessive pressure protection systems of theoil pipelinesin BS Plebanka
The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:
- Shutdown of a section of the pipeline in Napachanie
- Renovation of the railway crossing in Mykanów
- Insulation of the SZ7W Plecewice and SZ6W Helenka valve houses
- Underground pipeline in Trzepowo Nowe mending
- Hydrant system in ST-3 Góry mending
- Liquidation of shallowing of the DN 500 oil pipeline in Polesie
- Insulation works on pipeline entrance and exit sections in ST-6 Łupowo
The following service was provided for the MICRONET Company:
- Renovation of the storage tank no. 9 in the OLPP in Wola Rędzińska
ROK 2009 :
The following repairing works and modernizations were executed for the AGAT S.A. Company:
- The Furfural installation in Orlen Oil in Płock
- Expansion of the 111 warehouse section in Wroclaw
The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:
- Corrosion removal from the pipeline located in Sławoszewek
- Installation of the DN500 sliding bolt in ST-4 in Kleczew
- Connection of leakage prevention tanks in ST-2a in Orzechowo
- Removal of pipeline shallowings in Władysławów, Grabowa, Laski
- Replacement of a section of underground pipeline located between Góry and Kleczew
- Corrosion removal from R1-R2 pipeline in Gdansk
ROK 2008 :
The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:
- Replacement of the DN600 sliding bolts at the Bug-Narew section of the pipeline
- Replacement of the DN 500 pipeline in Morasko, Chwałkowie, Psary Polskie
- Repair of hazardous materials storage in w BS Miszewo Strzałkowskie
- Repair of the fire protection network in ST-4 Kleczew
- Removal of pipeline and optic fiber shallowings in Jamki, Rękoraj Dobra, Biskupia Wola, Kamieńsk
- Disassembly of wedges from the Rd0 switchboard, which were prior user to connect R1 and R2 pipelines in BM Gdansk
- Examination of the condition of underground pipeline connections in Krubin, Osmólsk, Osmolin, Czerniew, Niespusza
The following tasks were performed for AGAT S.A. Company:
- Creation and preparation of the DN 300 pipeline for installation by utilization of the HDD drilling method. Drilling-related works were performed under the Vistula river, between the
Winduga and Kawka management points
- Installation of fuel storage system in the Air Base no. 32 in Łask
ROK 2007 :
A comprehensive modernization of the warehouse section no. 82 of the PKN ORLEN branch in Żurawnica was executed. The procedure included the following:
- Installation of new standard and wide-format filling systems
- Installation of new loading interface
- Replacement of fire protection piping for the filling systems and the toluene storage tank
- Modernization of foam and water pumping station
- Creation of toluene pumping station and foam accumulation system
- Creation of discharge system
- Creation of trestle piping
Construction of fuel storage installation and creation of the MPS1-MPS2 transmission pipeline in the Air Base no.32 in Łask. The executed undertakings included:
- Creation of supplementary installation in the jet fuel filter chamber
- Assembly of emergency tank piping
- Installation of underground pipelines connecting consecutive facilities, as well as creation of the transmission pipeline
Modernization of the technological installation of the first node pumping station located in ST-4 Kleczew, owned by the PERN S.A. Company:
- The modernization was mainly oriented on construction of oil disposal manifold for removal of oil from discharge pumps
Water removal from the fire protection installation of the V=2500 storage tank
- located in the warehouse section of the PKN ORLEN S.A. branch no. 31 in Gdansk
ROK 2006 :
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:
- Examination of the condition of underground pipeline connections in Podolin, Karpin, Majków, Twardosławice
- Repair of perimeter fire protection network in ST-1 Adamowo
Works performed for the NAFTOREMONT Sp. z o.o Company, 09-411 Płock, Zglenickiego 46 Street:
- Examination of the DN 800 pipeline for the Lotos Gdansk Company
Works performed for the Community Office in Suchy Las, 62-002 Suchy Las, Szkolna 13 Street:
- Creation of the oil pipeline casings DN700 and DN1000
Works performed for the HERO Poland Sp. z o.o., 09-401 Płock, Ciechomicka 15 Street:
- Assembly of jam production system
- Assembly of juice production line
ROK 2005 :
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:
- Examination of the condition of underground pipeline connections in Koluszki
- Repair of leakage prevention tanks in Łupowo, Kleczew, Tarnowo Podgórne
- Examination of the condition of underground pipeline connections in Łojki, Szarlejka, Lgota, Wola Hankowska
- Repair of industrial sewage system in Kleczew
- Modernization of oil cooling installation in the first node pumping stations in Kleczew, Tarnowo Podgórne, Łupowo, Góry
Works performed for the NAFTOREMONT Sp. z o.o Company, 09-411 Płock, Zglenickiego 46 Street:
- Disassembly of an unused DN600 pipeline in Sokołów Podlaski
ROK 2004 :
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:
- Examination of the condition of underground pipeline connections in Łąck, Lubień Kujawski, Chotel
- Replacement of underground pipeline in Sompolno
- Removal of pipeline shallowings in Budy Kozickie
Works performed for the NAFTOREMONT Sp. z o.o Company, 09-411 Płock, Zglenickiego 46 Street:
- Construction of the gas station in BS Plebanka
ROK 2003 :
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:
- Examination of the condition of underground pipeline connections in Sokołów Podlaski and Siemiatczyce
- Repair of the PG3/ST 2Apumping unit piping in Orzechowo
- Repair of air disposal piping in BS Plebanka
- Repair of the pipeline located above the Warta-Gopło channel
ROK :
ROK :
ROK :
ROK :
ROK :
ROK :
ROK :
ROK 2018 :
The following tasks were performed for AGAT S.A. Company:
- Renovation of the pipeline under the Lesiska – Sompolno swamp
- Construction and assembly works at MPS-1 in Powidz
- Prefabrication and assembly of pipelines during the construction of tanks at the Fuel Base in Koluszki
- Installation of a DN250 pipe and bolts in Biała Dolna
- Installation of a DN250 pipe and bolts in Wierzchowiska
The following renovations and modernizations were carried out for PERN S.A. Company:
- Renovation of foam collectors on SRs at the Fuel Base in Nowa Wieś Wielka
- Repair of the embankment protecting the pipelines of the I and II threads in Lubiechów Górny
- Replacement of collectors and valves at the distribution stations in the Fuel Base in Nowa Wieś Wielka
- Replacing the ladder on tank no. 11 at the Miszewko Strzałkowskie Base
ROK 2017 :
The following renovations and modernizations were carried out for PERN S.A. Company:
- Renovation of the DN600 pipeline under the road and parking lot in Miszewko Strzałkowskie
- Modernization of pump reliefs in SZ-3 Łupowo
- Modernization of the leak tank in SZ-1 Kleczew
- Liquidation of shallow water in Łęg
- Modernization of the oil installation in ST-5 Tarnowo Podgórne
the following tasks were performed for OLPP Sp. z o.o. Company:
- Construction of a new ON and OOP tray in the Fuel Base in Nowa Wieś Wielka
- Dismantling of roofs on tanks 16 and 17 in the Fuel Base in Nowa Wieś Wielka
- Renovation of water and foam installations on tank groups I and III in the Fuel Base in Nowa Wieś Wielka
- Renovation of water and foam installations on tank groups I and III in the Fuel Base in Nowa Wieś Wielka
The following tasks were performed for CLIMBEX SA Company:
- Renovation of the tank in the Wierzbno Fuel Terminal
- Renovation of tank no. 4 in the Miszewko Strzałkowskie Base
- Renovation of tanks no. 6 and 8 in the Gdańsk Base
- Renovation and legalization of the 22 V tank = 100,000 m³ at the Adamowo Base
The following task was completed for AGAT SA Company:
- Construction of an ON-LINE additive installation in Fuel Base No. 21 in Dębogórze
ROK 2016 :
The following renovations and modernizations were carried out for PERN S.A. Company:
- Renovation of the road crossing in Łęg
- Renovation of the DN500 pipeline under the road in Witnica
- Renovation of the first line of the pipeline at the training ground in Skwierzyna
- Repair of the dike dividing the reservoirs in the Miszewko Strzałkowskie Base
the following tasks were performed for OLPP Sp. z o.o. Company:
- Renovation of storage tank no. 5 V = 5,000 m³ in Fuel Base No. 5 in Emilianów
- Repair of the supporting structure pillars of the viaduct in Fuel Base No. 2 in Nowa Wieś Wielka
- Construction of an additive dosing installation in Fuel Base No. 2 in Nowa Wieś Wielka
ROK 2015 :
The following tasks were performed for AGAT S.A. Company:
- Execution of piping and foam installation as well as filling lines and arms at Fuel Terminal No. 74 in Ostrów Wlkp.
- Laying the 530 pipeline under the Bogusławice swamp
The following renovations and modernizations were carried out for PERN S.A. Company:
- Installation of a sewage tank in ST2 Zawady
- Renovation of the pipeline under the road in Skwierzyna
- Modernization of the Kc-1 II and Kc-2 II cleaner receiving and sending chambers in the Miszewko Strzałkowskie Base
- Securing the pipeline at the intersection with the drainage ditch in Leszno
- Modernization of the technological pipe system and reconstruction of the supports of the pipelines I and II in the SZ640 Bielinek
- Repair of the mobile ladder on tank no. 13 in the Miszewko Strzałkowskie Base
- Renovation of the pipeline under the road in Ramutówko
The following tasks were performed for CLIMBEX SA Company:
- Renovation and legalization of the 2 V=50,000 m³ tank in the Gdańsk Base
- Renovation and legalization of the 29 V tank = 50,000 m³ in the Miszewko Strzałkowskie Base
ROK 2014 :
The following renovations and modernizations were carried out for PERN S.A.:
- Repair of the mobile ladder on tank No. 9 in the Miszewko Strzalkowskie Depot
- Repair of DN500 pipeline under the road in Gutowo Wielkie municipality
- Renovation of the tray in the Adamowo Base
- Modernization of tank pipelines on tanks 23 and 26 in the Miszewko Strzałkowskie Base
- Renovation of the DN300 pipeline on the SF1 Płock – Nowa Wieś Wielka section in Seroczki Kol.
the following tasks were performed for OLPP Sp. z o.o. Company:
- Replacement of technological tanks in Fuel Base No. 17 in Barycz
- Renovation of technological installations in the product pumping station in Fuel Base No. 15 in Narewka
The following tasks were performed for AGAT S.A. Company:
- Expansion of the fuel supply system in Gdynia
- Anti-corrosion protection of tank manholes in MPS-2 in Krzesiny
The following tasks were performed for CLIMBEX SA Company:
- Renovation and legalization of the 2 V=50,000 m³ tank in the Gdańsk Base
- Renovation and legalization of the 29 V tank = 50,000 m³ in the Miszewko Strzałkowskie Base
ROK 2013 :
The following tasks were performed for AGAT S.A. Company:
- Construction of MPS-1 and MPS-2 airport storage areas; installation of transmission pipeline on the military airport in Poznan-Krzesiny
The following renovations and modernizations were carried out for PERN Przyjaźń SA Company:
- Repair of dike in BS Plebanka
- Execution of fencing-related works in Z6W Helenka and Z10W Leszno
- Repair of foundations of the second node’s output tray in Zawady
- Installation of the DN1000 sliding bolt in BM Gdansk
- Modernization of the protection system in the office located in Miszewo Strzałkowskie
- Installation of a DN1000 bolt in BM Gdańsk
The following task was carried out for TECHNOMONTAŻ Sp. z o. o.:
- Safe pipe cutting in BP in Emilianowo
The following service was provided for the CKTiS S.A. Company:
- Corrosion removal from steel installations in Cracow-Olszanica
ROK 2012 :
The following tasks were performed for AGAT S.A. Company:
- Modernization of the JET-A1 fuel intake and distribution system in TP no. 81 in Cracow Olszanica
- Construction of MPS-1 and MPS-2 airport storage areas; installation of transmission pipeline on the military airport in Poznan-Krzesiny
The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:
- Repair of oil storage tank in ST-4 Kleczew
- Repair of protective components of the pipeline section crossing the watercourse in Gorczenica
- Replacement of the DN600 sliding bolt in SZ Jasienica
- Shallowing of the optical fiber at the intersection with the Brzozów channel
ROK 2011 :
The following tasks were performed for AGAT S.A. Company:
- Lowering of the pipeline in BM 111 in Wroclaw
- Reconstruction of the pumping station and the slop tank system in BP Emilianów
- Expansion of MPS-1 and MPS-1 of the airport in Łask
- Creation of the comprehensive fire protection system, including directional pipelines for the EB1 and EB2 tanks in BM111 in Wroclaw
- Creation of the DN200 tank connecting pipeline in BM111 in Wroclaw
- Connection of the fire protection system to the foam distribution turrets in BM 111 in Wroclaw
- Creation of customized adapters for the ENRAF device in BM 111 in Wroclaw
- Creation of customized fire sprinkler system, being a part of the loading interface in BM 111 in Wroclaw
The following repairing works and modernizations were executed for the PERN Przyjaźń S.A. Company:
- Replacement of measuring posts in the city center section
- Pipeline R1 –R2 in Gdansk mending
- Oil gathering unit in ST-6 Łupowo mending
- Repair of horizontal perforations under the road in Mykanów, Konopiska
- Installation of measuring posts in the village of Miroslav
- Replacement of the pipeline in Trzepowo Nowe
ROK 2010 :
The following tasks were performed for AGAT S.A. Company:
- Modernization of the fire protection system in the OLPP no. 9 Fuel Depot in Wola Rzędzińska
- Modernization of 10 fuel tanks for the PKN Orlen SA
- Modernization of excessive pressure protection systems of theoil pipelinesin BS Plebanka
The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:
- Shutdown of a section of the pipeline in Napachanie
- Renovation of the railway crossing in Mykanów
- Insulation of the SZ7W Plecewice and SZ6W Helenka valve houses
- Underground pipeline in Trzepowo Nowe mending
- Hydrant system in ST-3 Góry mending
- Liquidation of shallowing of the DN 500 oil pipeline in Polesie
- Insulation works on pipeline entrance and exit sections in ST-6 Łupowo
The following service was provided for the MICRONET Company:
- Renovation of the storage tank no. 9 in the OLPP in Wola Rędzińska
ROK 2009 :
The following repairing works and modernizations were executed for the AGAT S.A. Company:
- The Furfural installation in Orlen Oil in Płock
- Expansion of the 111 warehouse section in Wroclaw
The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:
- Corrosion removal from the pipeline located in Sławoszewek
- Installation of the DN500 sliding bolt in ST-4 in Kleczew
- Connection of leakage prevention tanks in ST-2a in Orzechowo
- Removal of pipeline shallowings in Władysławów, Grabowa, Laski
- Replacement of a section of underground pipeline located between Góry and Kleczew
- Corrosion removal from R1-R2 pipeline in Gdansk
ROK 2008 :
The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:
- Replacement of the DN600 sliding bolts at the Bug-Narew section of the pipeline
- Replacement of the DN 500 pipeline in Morasko, Chwałkowie, Psary Polskie
- Repair of hazardous materials storage in w BS Miszewo Strzałkowskie
- Repair of the fire protection network in ST-4 Kleczew
- Removal of pipeline and optic fiber shallowings in Jamki, Rękoraj Dobra, Biskupia Wola, Kamieńsk
- Disassembly of wedges from the Rd0 switchboard, which were prior user to connect R1 and R2 pipelines in BM Gdansk
- Examination of the condition of underground pipeline connections in Krubin, Osmólsk, Osmolin, Czerniew, Niespusza
The following tasks were performed for AGAT S.A. Company:
- Creation and preparation of the DN 300 pipeline for installation by utilization of the HDD drilling method. Drilling-related works were performed under the Vistula river, between the
Winduga and Kawka management points - Installation of fuel storage system in the Air Base no. 32 in Łask
ROK 2007 :
A comprehensive modernization of the warehouse section no. 82 of the PKN ORLEN branch in Żurawnica was executed. The procedure included the following:
- Installation of new standard and wide-format filling systems
- Installation of new loading interface
- Replacement of fire protection piping for the filling systems and the toluene storage tank
- Modernization of foam and water pumping station
- Creation of toluene pumping station and foam accumulation system
- Creation of discharge system
- Creation of trestle piping
Construction of fuel storage installation and creation of the MPS1-MPS2 transmission pipeline in the Air Base no.32 in Łask. The executed undertakings included:
- Creation of supplementary installation in the jet fuel filter chamber
- Assembly of emergency tank piping
- Installation of underground pipelines connecting consecutive facilities, as well as creation of the transmission pipeline
Modernization of the technological installation of the first node pumping station located in ST-4 Kleczew, owned by the PERN S.A. Company:
- The modernization was mainly oriented on construction of oil disposal manifold for removal of oil from discharge pumps
Water removal from the fire protection installation of the V=2500 storage tank
- located in the warehouse section of the PKN ORLEN S.A. branch no. 31 in Gdansk
ROK 2006 :
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:
- Examination of the condition of underground pipeline connections in Podolin, Karpin, Majków, Twardosławice
- Repair of perimeter fire protection network in ST-1 Adamowo
Works performed for the NAFTOREMONT Sp. z o.o Company, 09-411 Płock, Zglenickiego 46 Street:
- Examination of the DN 800 pipeline for the Lotos Gdansk Company
Works performed for the Community Office in Suchy Las, 62-002 Suchy Las, Szkolna 13 Street:
- Creation of the oil pipeline casings DN700 and DN1000
Works performed for the HERO Poland Sp. z o.o., 09-401 Płock, Ciechomicka 15 Street:
- Assembly of jam production system
- Assembly of juice production line
ROK 2005 :
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:
- Examination of the condition of underground pipeline connections in Koluszki
- Repair of leakage prevention tanks in Łupowo, Kleczew, Tarnowo Podgórne
- Examination of the condition of underground pipeline connections in Łojki, Szarlejka, Lgota, Wola Hankowska
- Repair of industrial sewage system in Kleczew
- Modernization of oil cooling installation in the first node pumping stations in Kleczew, Tarnowo Podgórne, Łupowo, Góry
Works performed for the NAFTOREMONT Sp. z o.o Company, 09-411 Płock, Zglenickiego 46 Street:
- Disassembly of an unused DN600 pipeline in Sokołów Podlaski
ROK 2004 :
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:
- Examination of the condition of underground pipeline connections in Łąck, Lubień Kujawski, Chotel
- Replacement of underground pipeline in Sompolno
- Removal of pipeline shallowings in Budy Kozickie
Works performed for the NAFTOREMONT Sp. z o.o Company, 09-411 Płock, Zglenickiego 46 Street:
- Construction of the gas station in BS Plebanka
ROK 2003 :
Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:
- Examination of the condition of underground pipeline connections in Sokołów Podlaski and Siemiatczyce
- Repair of the PG3/ST 2Apumping unit piping in Orzechowo
- Repair of air disposal piping in BS Plebanka
- Repair of the pipeline located above the Warta-Gopło channel