List of projects

ROK 2018 :

The following tasks were performed for AGAT S.A. Company:

  • Renovation of the pipeline under the Lesiska – Sompolno swamp
  • Construction and assembly works at MPS-1 in Powidz
  • Prefabrication and assembly of pipelines during the construction of tanks at the Fuel Base in Koluszki
  • Installation of a DN250 pipe and bolts in Biała Dolna
  • Installation of a DN250 pipe and bolts in Wierzchowiska

The following renovations and modernizations were carried out for PERN S.A. Company:

  • Renovation of foam collectors on SRs at the Fuel Base in Nowa Wieś Wielka
  • Repair of the embankment protecting the pipelines of the I and II threads in Lubiechów Górny
  • Replacement of collectors and valves at the distribution stations in the Fuel Base in Nowa Wieś Wielka
  • Replacing the ladder on tank no. 11 at the Miszewko Strzałkowskie Base

ROK 2017 :

The following renovations and modernizations were carried out for PERN S.A. Company:

  • Renovation of the DN600 pipeline under the road and parking lot in Miszewko Strzałkowskie
  • Modernization of pump reliefs in SZ-3 Łupowo
  • Modernization of the leak tank in SZ-1 Kleczew
  • Liquidation of shallow water in Łęg
  • Modernization of the oil installation in ST-5 Tarnowo Podgórne

the following tasks were performed for OLPP Sp. z o.o. Company:

  • Construction of a new ON and OOP tray in the Fuel Base in Nowa Wieś Wielka
  • Dismantling of roofs on tanks 16 and 17 in the Fuel Base in Nowa Wieś Wielka
  • Renovation of water and foam installations on tank groups I and III in the Fuel Base in Nowa Wieś Wielka
  • Renovation of water and foam installations on tank groups I and III in the Fuel Base in Nowa Wieś Wielka

The following tasks were performed for CLIMBEX SA Company:

  • Renovation of the tank in the Wierzbno Fuel Terminal
  • Renovation of tank no. 4 in the Miszewko Strzałkowskie Base
  • Renovation of tanks no. 6 and 8 in the Gdańsk Base
  • Renovation and legalization of the 22 V tank = 100,000 m³ at the Adamowo Base

The following task was completed for AGAT SA Company:

  • Construction of an ON-LINE additive installation in Fuel Base No. 21 in Dębogórze

ROK 2016 :

The following renovations and modernizations were carried out for PERN S.A. Company:

  • Renovation of the road crossing in Łęg
  • Renovation of the DN500 pipeline under the road in Witnica
  • Renovation of the first line of the pipeline at the training ground in Skwierzyna
  • Repair of the dike dividing the reservoirs in the Miszewko Strzałkowskie Base

the following tasks were performed for OLPP Sp. z o.o. Company:

  • Renovation of storage tank no. 5 V = 5,000 m³ in Fuel Base No. 5 in Emilianów
  • Repair of the supporting structure pillars of the viaduct in Fuel Base No. 2 in Nowa Wieś Wielka
  • Construction of an additive dosing installation in Fuel Base No. 2 in Nowa Wieś Wielka

ROK 2015 :

The following tasks were performed for AGAT S.A. Company:

  • Execution of piping and foam installation as well as filling lines and arms at Fuel Terminal No. 74 in Ostrów Wlkp.
  • Laying the 530 pipeline under the Bogusławice swamp

The following renovations and modernizations were carried out for PERN S.A. Company:

  • Installation of a sewage tank in ST2 Zawady
  • Renovation of the pipeline under the road in Skwierzyna
  • Modernization of the Kc-1 II and Kc-2 II cleaner receiving and sending chambers in the Miszewko Strzałkowskie Base
  • Securing the pipeline at the intersection with the drainage ditch in Leszno
  • Modernization of the technological pipe system and reconstruction of the supports of the pipelines I and II in the SZ640 Bielinek
  • Repair of the mobile ladder on tank no. 13 in the Miszewko Strzałkowskie Base
  • Renovation of the pipeline under the road in Ramutówko

The following tasks were performed for CLIMBEX SA Company:

  • Renovation and legalization of the 2 V=50,000 m³ tank in the Gdańsk Base
  • Renovation and legalization of the 29 V tank = 50,000 m³ in the Miszewko Strzałkowskie Base

ROK 2014 :

The following renovations and modernizations were carried out for PERN S.A.:

  • Repair of the mobile ladder on tank No. 9 in the Miszewko Strzalkowskie Depot
  • Repair of DN500 pipeline under the road in Gutowo Wielkie municipality
  • Renovation of the tray in the Adamowo Base
  • Modernization of tank pipelines on tanks 23 and 26 in the Miszewko Strzałkowskie Base
  • Renovation of the DN300 pipeline on the SF1 Płock – Nowa Wieś Wielka section in Seroczki Kol.

the following tasks were performed for OLPP Sp. z o.o. Company:

  • Replacement of technological tanks in Fuel Base No. 17 in Barycz
  • Renovation of technological installations in the product pumping station in Fuel Base No. 15 in Narewka

The following tasks were performed for AGAT S.A. Company:

  • Expansion of the fuel supply system in Gdynia
  • Anti-corrosion protection of tank manholes in MPS-2 in Krzesiny

The following tasks were performed for CLIMBEX SA Company:

  • Renovation and legalization of the 2 V=50,000 m³ tank in the Gdańsk Base
  • Renovation and legalization of the 29 V tank = 50,000 m³ in the Miszewko Strzałkowskie Base

ROK 2013 :

The following tasks were performed for AGAT S.A. Company:

  • Construction of MPS-1 and MPS-2 airport storage areas; installation of transmission pipeline on the military airport in Poznan-Krzesiny

The following renovations and modernizations were carried out for PERN Przyjaźń SA Company:

  • Repair of dike in BS Plebanka
  • Execution of fencing-related works in Z6W Helenka and Z10W Leszno
  • Repair of foundations of the second node’s output tray in Zawady
  • Installation of the DN1000 sliding bolt in BM Gdansk
  • Modernization of the protection system in the office located in Miszewo Strzałkowskie
  • Installation of a DN1000 bolt in BM Gdańsk

The following task was carried out for TECHNOMONTAŻ Sp. z o. o.:

  • Safe pipe cutting in BP in Emilianowo

The following service was provided for the CKTiS S.A. Company:

  • Corrosion removal from steel installations in Cracow-Olszanica

ROK 2012 :

The following tasks were performed for AGAT S.A. Company:

  • Modernization of the JET-A1 fuel intake and distribution system in TP no. 81 in Cracow Olszanica
  • Construction of MPS-1 and MPS-2 airport storage areas; installation of transmission pipeline on the military airport in Poznan-Krzesiny

The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:

  • Repair of oil storage tank in ST-4 Kleczew
  • Repair of protective components of the pipeline section crossing the watercourse in Gorczenica
  • Replacement of the DN600 sliding bolt in SZ Jasienica
  • Shallowing of the optical fiber at the intersection with the Brzozów channel

ROK 2011 :

The following tasks were performed for AGAT S.A. Company:

  • Lowering of the pipeline in BM 111 in Wroclaw
  • Reconstruction of the pumping station and the slop tank system in BP Emilianów
  • Expansion of MPS-1 and MPS-1 of the airport in Łask
  • Creation of the comprehensive fire protection system, including directional pipelines for the EB1 and EB2 tanks in BM111 in Wroclaw
  • Creation of the DN200 tank connecting pipeline in BM111 in Wroclaw
  • Connection of the fire protection system to the foam distribution turrets in BM 111 in Wroclaw
  • Creation of customized adapters for the ENRAF device in BM 111 in Wroclaw
  • Creation of customized fire sprinkler system, being a part of the loading interface in BM 111 in Wroclaw

The following repairing works and modernizations were executed for the PERN Przyjaźń S.A. Company:

  • Replacement of measuring posts in the city center section
  • Pipeline R1 –R2 in Gdansk mending
  • Oil gathering unit in ST-6 Łupowo mending
  • Repair of horizontal perforations under the road in Mykanów, Konopiska
  • Installation of measuring posts in the village of Miroslav
  • Replacement of the pipeline in Trzepowo Nowe

ROK 2010 :

The following tasks were performed for AGAT S.A. Company:

  • Modernization of the fire protection system in the OLPP no. 9 Fuel Depot in Wola Rzędzińska
  • Modernization of 10 fuel tanks for the PKN Orlen SA
  • Modernization of excessive pressure protection systems of theoil pipelinesin BS Plebanka

The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:

  • Shutdown of a section of the pipeline in Napachanie
  • Renovation of the railway crossing in Mykanów
  • Insulation of the SZ7W Plecewice and SZ6W Helenka valve houses
  • Underground pipeline in Trzepowo Nowe mending
  • Hydrant system in ST-3 Góry mending
  • Liquidation of shallowing of the DN 500 oil pipeline in Polesie
  • Insulation works on pipeline entrance and exit sections in ST-6 Łupowo

The following service was provided for the MICRONET Company:

  • Renovation of the storage tank no. 9 in the OLPP in Wola Rędzińska

ROK 2009 :

The following repairing works and modernizations were executed for the AGAT S.A. Company:

  • The Furfural installation in Orlen Oil in Płock
  • Expansion of the 111 warehouse section in Wroclaw

The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:

  • Corrosion removal from the pipeline located in Sławoszewek
  • Installation of the DN500 sliding bolt in ST-4 in Kleczew
  • Connection of leakage prevention tanks in ST-2a in Orzechowo
  • Removal of pipeline shallowings in Władysławów, Grabowa, Laski
  • Replacement of a section of underground pipeline located between Góry and Kleczew
  • Corrosion removal from R1-R2 pipeline in Gdansk

ROK 2008 :

The following renovations and modernizations were carried out for PERN Przyjaźń SA Comapny:

  • Replacement of the DN600 sliding bolts at the Bug-Narew section of the pipeline
  • Replacement of the DN 500 pipeline in Morasko, Chwałkowie, Psary Polskie
  • Repair of hazardous materials storage in w BS Miszewo Strzałkowskie
  • Repair of the fire protection network in ST-4 Kleczew
  • Removal of pipeline and optic fiber shallowings in Jamki, Rękoraj Dobra, Biskupia Wola, Kamieńsk
  • Disassembly of wedges from the Rd0 switchboard, which were prior user to connect R1 and R2 pipelines in BM Gdansk
  • Examination of the condition of underground pipeline connections in Krubin, Osmólsk, Osmolin, Czerniew, Niespusza

The following tasks were performed for AGAT S.A. Company:

  • Creation and preparation of the DN 300 pipeline for installation by utilization of the HDD drilling method. Drilling-related works were performed under the Vistula river, between the
    Winduga and Kawka management points
  • Installation of fuel storage system in the Air Base no. 32 in Łask

ROK 2007 :

A comprehensive modernization of the warehouse section no. 82 of the PKN ORLEN branch in Żurawnica was executed. The procedure included the following:

  • Installation of new standard and wide-format filling systems
  • Installation of new loading interface
  • Replacement of fire protection piping for the filling systems and the toluene storage tank
  • Modernization of foam and water pumping station
  • Creation of toluene pumping station and foam accumulation system
  • Creation of discharge system
  • Creation of trestle piping

Construction of fuel storage installation and creation of the MPS1-MPS2 transmission pipeline in the Air Base no.32 in Łask. The executed undertakings included:

  • Creation of supplementary installation in the jet fuel filter chamber
  • Assembly of emergency tank piping
  • Installation of underground pipelines connecting consecutive facilities, as well as creation of the transmission pipeline

Modernization of the technological installation of the first node pumping station located in ST-4 Kleczew, owned by the PERN S.A. Company:

  • The modernization was mainly oriented on construction of oil disposal manifold for removal of oil from discharge pumps

Water removal from the fire protection installation of the V=2500 storage tank

  • located in the warehouse section of the PKN ORLEN S.A. branch no. 31 in Gdansk

ROK 2006 :

Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:

  • Examination of the condition of underground pipeline connections in Podolin, Karpin, Majków, Twardosławice
  • Repair of perimeter fire protection network in ST-1 Adamowo

Works performed for the NAFTOREMONT Sp. z o.o Company, 09-411 Płock, Zglenickiego 46 Street:

  • Examination of the DN 800 pipeline for the Lotos Gdansk Company

Works performed for the Community Office in Suchy Las, 62-002 Suchy Las, Szkolna 13 Street:

  • Creation of the oil pipeline casings DN700 and DN1000

Works performed for the HERO Poland Sp. z o.o., 09-401 Płock, Ciechomicka 15 Street:

  • Assembly of jam production system
  • Assembly of juice production line

ROK 2005 :

Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:

  • Examination of the condition of underground pipeline connections in Koluszki
  • Repair of leakage prevention tanks in Łupowo, Kleczew, Tarnowo Podgórne
  • Examination of the condition of underground pipeline connections in Łojki, Szarlejka, Lgota, Wola Hankowska
  • Repair of industrial sewage system in Kleczew
  • Modernization of oil cooling installation in the first node pumping stations in Kleczew, Tarnowo Podgórne, Łupowo, Góry

Works performed for the NAFTOREMONT Sp. z o.o Company, 09-411 Płock, Zglenickiego 46 Street:

  • Disassembly of an unused DN600 pipeline in Sokołów Podlaski

ROK 2004 :

Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:

  • Examination of the condition of underground pipeline connections in Łąck, Lubień Kujawski, Chotel
  • Replacement of underground pipeline in Sompolno
  • Removal of pipeline shallowings in Budy Kozickie

Works performed for the NAFTOREMONT Sp. z o.o Company, 09-411 Płock, Zglenickiego 46 Street:

  • Construction of the gas station in BS Plebanka

ROK 2003 :

Works performed for the PERN „Przyjaźń” S.A. Company, 09-400 Płock, Kazimierza Wielkiego 2a Street:

  • Examination of the condition of underground pipeline connections in Sokołów Podlaski and Siemiatczyce
  • Repair of the PG3/ST 2Apumping unit piping in Orzechowo
  • Repair of air disposal piping in BS Plebanka
  • Repair of the pipeline located above the Warta-Gopło channel